1. Project Name: Preliminary Engineering Cum Traffic Survey for new BG line from Missamari to Tawang (Via Balipara, Bhalukpong) approx 329.20 Km.
PROJECT STATUS: Initial Field verification completed, alignment designing work is in progress.
CLIENT: The Dy Chief Engineer/CON, North East Frontier Railways, Rangiya, Assam.
Completed Projects - Engineering Projects
1. Project Name: Updating survey of New BG Line from Lekhapani-Kharsang.
CLIENT: North East Frontier Railway, Dibrugarh-786001, Assam.
2. Project Name: Updating survey of New BG Line from Amguri-Naginimora.
CLIENT: North East Frontier Railway, Dibrugarh-786001, Assam.
3. Project Name: Preliminary Engineering survey for new BG line from Jorhat to Sibsagar in connection with Updating of Preliminary Engineering cum Traffic survey for new BG line from Chaparmukh to Dibrugarh – Digitisation of alignment and other allied works.
CLIENT: North East Frontier Railways H.Q. Maligaon, Guwahati, Assam.
4. Project Name: Updating of Reconnaissance Engineering cum Traffic Survey for New BG Line from 'Sarthebari to Changsari'.
CLIENT: North East Frontier Railway, Jogighopa, Assam.
5. Project Name: Feasibility study and field verification of alignment for New BG line from Digaru/Panbari/Tetelia on existing Guwahati-Lumding BG section to Byrnihat.
CLIENT: North East Frontier Railways H.Q. Maligaon, Guwahati, Assam.
6. Project Name: Feasibility Survey for a New BG Line from Dhansiri-Ganeshnagar-Sakhobi in connection with Dimapur-Kohima new B.G. Railway Line.
CLIENT: North East Frontier Railways H.Q. Maligaon, Guwahati, Assam.
7. Project Name: Preliminary Engineering cum Traffic Survey for a New BG Line from Chalsa-Jaldhaka-Digitization of Alignment.
CLIENT: The Dy Chief Engineer/Con/Survey, North East Frontier Railway , Maligaon, Guwahati- 781011, Assam.
8. Project Name: Preliminary Engineering cum Traffic Survey for new BG Line from Dullavcerra-Cheragi.
CLIENT: The Deputy Chief Engineer/Con-II, North East Frontier Railway , Silchar, Assam.
9. Project Name: Final Location Survey with geo-technical investigation, consultancy for designing and construction methodology of tunnel, sub-soil investigation for major/minor bridges and design of foundations, sub-structure and superstructure including preparation of detailed estimate and submission of bill of quantities etc. in connection with construction of new BG (Broad Gauge) railway line from Azara (ASSAM) to Byrnihat (MEGHALAYA).
CLIENT: North East Frontier Railways H.Q.,
Maligaon, Guwahati-781011, Assam
10. Project Name: Conducting of Reconnaissance Engineering Field Survey, for the New BG (Broad Gauge) railway line Route- From Rupai (Assam) to Parashuramkunda (Arunachal Pradesh) via Mahadevpur, Namesai, Chingkham.
CLIENT: North East Frontier Railways H.Q.
Maligaon, Guwahati-781011, Assam.
11. Project Name: Conducting of Reconnaissance Engineering Field Survey, for the New BG (Broad Gauge) railway line Route- From Rupai (Assam) to Parashuramkunda (Arunachal Pradesh) via Mahadevpur, Namesai, Chingkham.
CLIENT: North East Frontier Railways,
Dibrugarh-786001, Assam.
12. Project Name: Reconnaissance Engineering cum traffic survey for construction of new Railway bridge over River Brahmaputra at Saraighat.
Project awarded by: Office of General Manager (Construction).
13. Project Name: Best alignment identification for proposed new BG railway line of NF Railways, Maligaon, including - GPS based survey, DEM generation with 3 best alignment and identifying the bridge, tunnel, location and engineering information like curve etc. under given conditions
a. Dimapur – Kohima, (Nagaland)
b. Jiribam- Imphal, (Assam-Manipur)
c. Bhairabi-Sairang, (Mizoram)
d. Tuli – Tuli Town, (Nagaland –Assam)
Client: NF Railways H.Q., Maligaon, Assam.
14. Project Name: ASEB (Assam State Electricity Board) New transmission line [220/132KV] alignment identification and designing using satellite image and GPS technology between –
a. Jorhat – Nazira - 80km.
b. Sivsagar – Nazira – 20 km.
c. Moran- Lakwa – 16 km.
d. Tinsukia – Namrup – 40km.
e. Biswanath Chariali –Gohpur – 70km.
Client: Assam State Electricity Board.
15. Rainwater Harvesting at Administrative Building of Guwahati Refinery,
Client: Indian Oil Corporation Ltd, Refineries Division, Guwahati Refinery.
16. Project Name: Designing of railways bridges for North bank of Brahmaputra for Bogibeel approach road
17. Project Name: Best alignment identification & design for proposed road from Halflong town to proposed new Halflong railway station for Broad Gauge Conversion from Silchar to Lumding (Assam)
Client: Indian Railways.
18. Project Name: Alignment fixing & design of Tunnel (length 3.2 km) for Broad Gauge Conversion from Silchar to Lumding (Assam)