ISO 9001:2008 Certified
  • Home
  • About Us
  • Projects
  • Sister Concern
  • Careers
  • Contacts


 

Projects


GIS & RS Projects


Environment


Survey / Design


Engg. Projects


Software


Overseas Clients



Download Company Profile




On - Going Projects

1. EIA & EMP     

1. Project Name: Action Proposed to Reduce Noise level in the Construction phase of 4-laning of Jorabat-Barapani Expressway & Measures to conserve Barapani Lake

Project Status: Draft Report Prepared ( approval awaited).

CLIENT: Ramky Infrastructure Limited, RIL House No.-1, Panjabari Road, Behind Mosque, F Ahmed Nagar, 6 th Mile, Guwahati-37

 

2. Project Name: Hiring of Services for Carrying out EIA Study for Expansion of Gas field Development in Tengakhat-Naharkatia-Jorajan area, Tinsukia-Dhola area and Dumduma-Pengeri area, Assam by M/s Oil India Limited

Project Status: Report Submitted to the MoEF for Environmental Clearance. Technical presentation at MoEF Delhi is awaited.

CLIENT: The Head Contracts, Contracts Department, Oil India Limited, (A Govt. of India Enterprise), Duliajan-786 602, Dibrugarh, Assam

3. Project Name: Provision of Consultancy Services for CTE/CTO/HWA/Forest Clearance for Dirok 4 (Assam).

Project Status: 70% of work completed.

CLIENT: Hindustan Oil Exploration Company Limited, ‘Lakshmi Chambers', 192, St. Mary's Road, Alwarpet, Chennai – 600018, India.

 

4. Project Name: Contract for Environmental Impact Assessment and Risk Assessment Studies in CBM Block AS-CBM-2008/IV.

Project Status: Report Submitted to the MoEF for Environmental Clearance. Technical presentation at MoEF Delhi is awaited.

CLIENT: Dart Energy (AS) Pte Ltd., DLF Cyber City, Phase-III, Building No.9, Tower-B, 16th Floor, Gurgaon – 122002, India


Completed Projects -

1. Project Name: AAQ & Stack Emission Monitoring at GVIL cement plant site in Meghalaya

CLIENT: Green Valliey Industries Limited, Vill.: Nongsning, P.O.: Chiehruphi, P.S.: Khliehriat, Dist: Jaintia Hills, Meghalaya, 793200.

 

2. Project Name: Environment Impact Assessment (EIA) & Rapid Risk Assessment (RRA) studies for carrying out Exploratory Drilling in the Block AS - ONN - 2000/1

CLIENT: Reliance Industries Ltd - Operator (Petroleum Business - E & P), Reliance Corporate Park, C/o Telene Petrochemicals Ltd., Building No. 8, "A" Wing, Ground Floor, Thane Belapur Road, Gansoli, Navi Mumbai - 400701, India.

 

3. Project Name: Hiring of Services for Carrying out EIA Study for Six Gas Field Development Project of Oil India Limited.

CLIENT: Oil India Limited, (A Govt. of India Enterprise) DULIAJAN - 786 602, DIBRUGARH, ASSAM

 

4. Project Name: Air Quality Monitoring of Amguri Oil Field and Moran Setup

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

5. Project Name: Prepare EIA and EMP Report for pipeline project from Tengakhat to Shalmari.

CLIENT: Oil India Limited, Narengi, Guwahati, Assam.

 

6. Project Name: Rapid Environmental Impact Assessment And Management Plan Based On Study Carried Out With Reference To Seismic Data Acquisition Project, Covering – Dergaon, Titabor, Moriani & Naginijan.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

7. Project Name: Rapid Environmental Impact Assessment Study In Amguri Block, Oil / Gas Field Of Upper Assam.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

8. Project Name: Detail Study On Environmental Impact Assessment, Environment Management Planning In AA ON – 7 BLOCK, Including Well 500.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

9. Project Name: Environment Impact Assessment Study On OIL Pipeline Row Starting From Duliajan To Numaligarh For The Proposed Pipeline Laying Project Of AGCL.

CLIENT: Assam Gas Company Limited, Duliajan, Assam.

 

10. Project Name: Rapid Risk Assessment Of Underground Natural Gas Pipeline From Madhuban To Numaligarh For The Proposed Pipeline Laying Project Of AGCL.

CLIENT: Assam Gas Company Limited, Duliajan, Assam.

 

11. Project Name: Rapid Environmental Impact Assessment Based On Study Carried Out With Reference To Seismic Data Acquisition, Project Of BLOCK AA – ONN – 2003/2 District Changlang – Arunachal Pradesh.

CLIENT: Geopetrol International Inc. Monaco – France.

 

12. Detail Study On Rapid Environmental Impact Assessment And Environment Management Plan In AAON-O7 BLOCK Dolakhoria, Borkathoni And Sonakhet.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

13. Project Name: Carrying out the Environmental (Air/Water) monitoring as per APCB norms for Amguri Block.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

14. Project Name: Detail Study On Rapid Environmental Impact Assessment And Environment Management Plan In Amguri Field.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

15. Project Name: Detail Study On Rapid Environmental Impact Assessment And Environment Management Plan Of BLOCK AA-ON/7 IN Assam & Nagaland (Belt Of Schuppen).

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

16. Project Name: Environmental Compliance Statement- Monitoring and Assessment of Environmental Components in and around the GGS during April to Jun 2006.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

17. Project Name: Environmental Compliance Statement- Monitoring and Assessment of Environmental Components in and around the GGS during July to September 2006.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

18. Project Name: Environmental Compliance Statement- Monitoring and Assessment of Environmental Components in and around the GGS during Oct. to Dec. 2006.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

19. Project Name: Monitoring Report On Water And Soil At Sonakhet Post Exploratory Well Site, AAON-07 Block.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

20. Project Name: EIA Study in and around Sadiya Area of Assam.

CLIENT: OIL India Limited , Duliajan.

 

21. Project Name: EIA-EMP Liaisoning with State PCB for obtaining environmental clearance for 1x20 MW capacity new Gas turbine project at Duliajan Power Station.

CLIENT: OIL India Limited , Duliajan.

 

22. Project Name: Monitoring Report On Water And Soil At Dholakharia Post Exploratory Well Site, AAON-07 Block.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

23. Project Name: Carryout the REIA study for Amguri Field – primarily covering 12 drilling locations – west south west of Well # 6 & 11 of Amguri.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

24. Project Name: EIA study for the proposed Amguri Block: AA-ONN-2004/1 Seismic Study.

CLIENT: Oil India Limited, Duliajan.

 

25. Project Name: Monitoring Report On Water And Soil at Amguri #10 B & Amguri #11.

CLIENT: Canoro Resources Limited, Calgary, Canada.

 

26. Project Name: Rain Water Harvesting at Administrative Building of Guwahati Refinery.

CLIENT: Indian Oil Corporation Limited (IOCL), Guwahati, Assam.

 

27. Project Name: EIA-EMP Study for Proposed Seismic Survey Project at NELP-III, Block: AA-ONN 2001/4 and NELP-IV, Block: AA-ONN 2002/4 in Nagaland.

CLIENT: Oil & Natural Gas Corporation Limited (ONGC), Jorhat, Assam

 

28. Project Name: Ambient Air Quality Monitoring & Assessment at different Locations of nearly surrounded area of ICL, Noonmati, factory Campus.

CLIENT: India Carbon Limited.

 

 © ENGECORC 2012